The various steps for the construction project

 
The various steps for the construction project
 

The construction of a house must be legally and in accordance with the standards required by the principle of urban planning and local structural arrangements. For this, an administrative permit must be obtained before work begins. These include planning permission be granted where the proposed works comply with the standards in force.

 

Get a building permit

 

From a logical point of view, the art of designing a building can be done by everyone. Moreover, software consistent with this situation that can help individuals create their own documents required for obtaining a building permit. However, legal provisions require to hire an architect for building a net floor area of ​​over 170 m².

 

An individual may be an individual application package for a building permit from the Town Hall. This applies to the construction of a house or carrying out the work that have a net floor area of ​​up to 170m ².

 

Individuals must bring a variety of administrative procedures to obtain their permission for:

  • Work on their homes: in particular, have undergone renovations or not an addition, some modifications of the openings, facade improvements, installation of solar and many other activities.
  • The development of their land, be it a moving or a realization of a terrace. In addition, the construction of a pool or a fence may well require this.
  • Administrative building of annexes: garages or garden shed
  • Building a house without the services of an architect
  • Building a house yourself

 

Declaring its work

 

It is important to note the administration's intentions to carry out workWith a "statement of work", the owner must consider the planning rules in force for a positive endorsement of seniorThis piece is an alternative administrative building permit for the work of a relatively large average

 

Manufacturers who plan to carry out the work or operations of construction or development should start following this approach:

 

  • The extensions or structures ranging from 20 to 80 m² for their SHOB
  • The high buildings, except for wind turbines, which have a gross floor area less or equal to 2 m and a height above the ground exceeds 12 meters
  • High walls of more or equal to 2 m
  • Swimming pool with a maximum surface area 100 m² with or without covers (mobile or fixed) of a maximum height of 1.80m
  • Greenhouses and frames with a height between 1.80 and 4.00 m with a floor area less than 2000 m² in the same land
  • A transformation exceeding the gross floor area of ​​10 m² in floor area (excluding area net work)
  • The transformation of the exterior facades of a house as the work of cleaning. 

To build a house, so it is important to follow the standards and to take all prior arrangements

 
Listed in: Real current events, Real estate project, Legal

An article by
 
© dopimmo.com
 
 
 
Comments
 
No comment.
 
Add a comment
Name or nickname (required):
 
Email:
Website :
Twitter :
 Only your username without @ or http
Comment:
To prevent abuse, please copy the code before confirming the form:
   
 
 
Real estate news by headings: Real current events, Durable construction, real diagnosis, Real estate project, Legal, Finance, Habitat, BTP, Justice, Acquisition, Contract, Insurance, Bank, Industry, Social, Lawsuit, Government, Media, Fusion, Internet, Communities, Decoration, Economy, Construction

 Place a real estate ad


Most popular
Previous Next
News
François Payelle, president of the FPI
Bouygues, trustful for the continuation of the activities of 2012
A congress on work and the urgencies of the HLM in September 2012
 Dopimmo Recommend to a friend