While making the measurements
To build his loft, it is necessary that this room or extra space may not be sufficient by having a level of at least 2.20 m below the ceiling and a higher level of 1.80 m or more. The size of the slab should be added for a total height of 4.20 m. In the case where space does not have these dimensions, we must abandon the project or the continued but ensuring that this development is sufficient to accommodate the prospective occupants.
Although there is sufficient space, the work can be carried out if they are not adapted to the existing framework. The best way is to have the original plan to build housing in order to properly consider the work.
If the project relates to a mezzanine built between two exterior walls, installing a metal pole used as a flexible beam in the wall on each side is recommended. If it is established in a corner, the installation of a pole to serve as support is required. But, in addition to a post, it is essential to properly ensure that the framework supports.
The study of weight and the stairs to ask
There are many systems that can be used for the construction of a new floor. But first, we must assess the weight that can be supported by the framework that is in the house. The materials are intended to build must agree as to the requirements of the frame in question. Thus, they must have a weight that is appropriate for the latter. The materials most suitable in this respect are prefabricated wood panels.
After that, it is necessary to conduct studies for the device access to the mezzanine. There should be a staircase that does not occupy large space, but that includes security features required as the rail. Thus, there will be no danger to those who will occupy the extra space or room.
According to its location and budget, the owner can choose the stairs that suits him best, and even adjust the bottom of it for storage.
Other contingencies and recommendations
Sometimes, there are living rooms which include a surplus of space including important high. You can use them to build a mezzanine, if necessary.
The possibilities are numerous and they depend on the height of ceilings in kitchen, bathroom, etc. But to ensure the possibility of construction, it is best to call on experts in the field. |