During a construction: the follow-up of the building site

 
If you decided to entrust your construction project to a company, always think of making a follow-up of building site.
 
 
During a construction: the follow-up of the building site
 

When you entrust the construction of your house to a professional company, this company must carry out work like agreed. However, it is advised to supervise and follow the evolution of those.

The principle of the follow-up of the building site
It is true that the owner has certain rights concerning the checking of advance of construction of his house. However, there exist limits with those. In a general way, the visit of the building site must be mentioned in the contract, if not the owner cannot reach it. According to the payments, the title of owner is granted only after the reception of the house. Therefore, being a simple person, it does not have the responsibility of ensure the good walk of the building work. All that relates to the latter is with the load of the manufacturer.
 
Nevertheless, it can at least once visit the place per week thanks to the agreement of the speakers. In this case, it is necessary to consult the date of intervention. In all case, since it is him which will invest and pour the call for capital, it must have the right to check the evolution of work. It will be able for example to directly visit the building site concerning the walls when it must pour the 15% of the price for the finalization of those.

The opening of the building site
The beginning of work will take place after the signature of the contract. But front, the future owner has one week of reflection during which it can make a cancellation or reconsider his ideas. The beginning of work is subjected to several criteria like obtaining the permit building and all the loans making it possible to ensure the completion of construction.

The subscription for insurances is also obligatory as well for the owner as the manufacturer. It is for example impossible to conclude the contract from construction of house, to have the loans and the license without the owner not subscribing to an insurance damage works. During the signature of the contract, the owner pays a sum with the manufacturer. The non-observance of the clauses of the agreement can lead to the nullity of the CCMI and the restitution of this sum.
It is important to give a a report on places with the manufacturer to be able to carry felt sorry for in the event of damage which has impacts on the public and deprived parts. Failing this, it is against the owner that the town hall and the promoter will be turned over. The types of damage which often arrives are the breaks of the pavements, the trees cut, the deterioration of the access roads, etc

The checking of work
The regular follow-up of work makes it possible to avoid various problems especially the obligatory formalities at the time of the final reception of the work. To be able to visit the place of construction as often as possible, it is necessary to envisage many work of completion. Several elements must be controlled during work. Among those, it is important to supervise the carcass work heavy castings which guarantee the setting out of water and the setting out of air of the building. There is also the second work like plumbing, electricity, joinery, painting, the plates, etc, to take into account.
 

 
Listed in: Real current events, Construction

An article by
 
© dopimmo.com
 
 
 
Comments
 
No comment.
 
Add a comment
Name or nickname (required):
 
Email:
Website :
Twitter :
 Only your username without @ or http
Comment:
To prevent abuse, please copy the code before confirming the form:
   
 
 
Real estate news by headings: Real current events, Durable construction, real diagnosis, Real estate project, Legal, Finance, Habitat, BTP, Justice, Acquisition, Contract, Insurance, Bank, Industry, Social, Lawsuit, Government, Media, Fusion, Internet, Communities, Decoration, Economy, Construction

 Place a real estate ad


Most popular
News
François Payelle, president of the FPI
Bouygues, trustful for the continuation of the activities of 2012
A congress on work and the urgencies of the HLM in September 2012
 Dopimmo Recommend to a friend